|
|
| Beam Work
|
 |
View from loft. |
|
| Barn is wrapped in tyvek
|
 |
Building has been wrapped in a weather resistant product called tyvek. This product prevents the infiltration of air and moisture. |
|
| Rear Of Barn
|
 |
Building Preped for siding. |
|
| Beams
|
 |
painting has begun |
|
| Granary Door
|
 |
Chestnut used for under stair closet |
|
| Closet Door
|
 |
Made this from some of the old lumber |
|
| Tree House
|
 |
Gate at top of first landing to rope ladder. |
|
| Spiral Stair case
|
 |
We tucked this spiral into the pantry for access to the loft area. |
|
| Tree House
|
 |
Went back this past June and added a few extra touches including three different paints. |
|
| Tree House
|
 |
Little deck area from trap door. |
|